The objective of this call is to support the deployment of alternative fuels supply infrastructure for road transport and airport ground operations, contributing to decarbonising transport along the TEN-T network. Eligible activities include the deployment of alternative fuels supply infrastructure in accordance with relevant EU regulations. Support is provided for publicly accessible charging pools for heavy duty vehicles and electrification of airport ground operations within the TEN-T transport network.
| Agency | CEF (EU) |
|---|---|
| Region | EU |
| Country | N/A |
| Legal form | Company, Government organization, NGO, Other |
| Start date | 18 Jun 2026 |
| End date | 6 Oct 2026 |
| Budget | 130,000,000 EUR (2026 budget year) |
| Proposal Admissibility | Proposal page limit and layout are described in section 5 of the call document and in Part B of the Application Form available in the Submission System. |
|---|---|
| Eligible Countries | Described in section 6 of the call document. |
| Other Eligibility Conditions | Described in section 6 of the call document. |
| Financial and Operational Capacity | Requirements for financial and operational capacity and exclusion are described in section 7 of the call document. |
| Evaluation and Award |
|
| Legal and Financial Set-up | Legal and financial set-up of the grants described in section 10 of the call document. |
| Publicly Accessible Charging Pools for HDV |
|
| Electrification of Airport Ground Operations |
|
| Operation and Maintenance | Beneficiary must operate and maintain supported infrastructure for a minimum of 5 years from the end date of the related grant agreement. If operated under a Public Service Obligation contract that expires earlier, the responsibility must transfer to the successor for the remainder of the 5-year period. |
| 24/7 Accessibility and Management for HDV Charging Pools |
|
| Documentation | https://ec.europa.eu/info/funding-tenders/opportunities/portal/screen/opportunities/topic-details/CEF-T-2026-AFIFGEN-COSTS |
Construction costs including chargers, power cabinets for charging satellites, canopies, safety and security devices, parking, circulation, and electricity infrastructure (cabling, substations, batteries, on-site dynamic energy management). |
For Safe and Secure Parking Areas (SSPA): only cost of chargers and electricity infrastructure serving recharging points. |
Costs related to vehicles. |
Costs related to land acquisition, renting/leasing of facilities, procurement and permits. |
Costs related to grid connection equipment owned by the Distribution System Operator (DSO) or Transmission System Operator (TSO). |
Administrative costs, including travel, subsistence, and indirect costs. |
Staff costs of the applicant (for in-house work). |
Costs relating to studies, design, work supervision, commissioning, communication, dissemination, and project management (in-house or outsourced). |
Operating Expenditure (OPEX), including consumables and energy consumption. |
Upgrade of existing electric recharging infrastructure. |
Recharging pools for electric vehicles located in elevated or underground parking buildings or in car/truck dealer or similar premises used by a specific group of users. |
In SSPAs: surfacing, lighting, civil works, safety and security, canopies, and service buildings other than chargers and electricity infrastructure are not eligible. |
Applicants must use the standard application form available in the Submission System. |
A detailed budget table per work package and a timetable (Gantt Chart) are required. |
Supporting documents may include: Letter of support/MS agreement, financial approval, environmental compliance files. |
Compliance with relevant EU regulations (AFIR, TEN-T, CEF Regulation). |
Demonstration of financial and operational capacity. |
Detailed description of the infrastructure location and type. |
Evidence of compliance with horizontal and technical requirements. |
Synergetic elements such as on-site renewable electricity generation and grid connection may be included but cannot exceed 20% of the total eligible costs and must be part of a dedicated work package. |